Description
PCB For Baxi Combi Instant 105 E Boiler 248731
The Baxi Combi Instant 105 E PCB controls the main functions of your boiler and ensures smooth operation. This refurbished PCB restores reliable communication between components and helps resolve common faults. The part number 248731 ensures accurate compatibility with Baxi Combi Instant 105 E models. Each unit is refurbished, tested, and ready to deliver consistent performance.
Compatible Boilers
Baxi Combi Instant Series
- Combi Instant 105 E (GC No. 47-075-09)
- Combi Instant 105E HE (GC No. 47-075-19)
- Combi Instant 80E (GC No. 47-075-13)
- Combi Instant 80E HE (GC No. 47-075-17)
If you’re looking for a Baxi Combi 100 HE Plus PCB 5109036 or any other different Baxi PCB, follow the link provided.
Why Choose This Product?
This Baxi PCB provides a cost-effective solution for control board faults. It helps restore heating and hot water performance quickly and efficiently. Each refurbished unit undergoes full testing to ensure stable operation and long service life. Choosing this PCB reduces repair costs while keeping your boiler running smoothly.
Delivery and Return
All orders placed before 1 PM are dispatched on the same working day. You can select standard delivery or upgrade to next-day courier service at checkout. Returns are accepted within 30 days if the item remains unused and in its original condition. Always use a Gas Safe registered engineer for installation and repairs to ensure safe and correct operation.
FAQs
1. What does the Baxi Combi Instant 105 E PCB do?
It controls the main boiler functions, including heating, hot water, and safety operations.
2. Which boilers fit this PCB?
This PCB fits Baxi Combi Instant 105 E, 105E HE, 80E, and 80E HE models using part number 248731.
3. Can this PCB fix boiler faults?
Yes. A faulty PCB often causes ignition failure, no heating, or error codes. Replacing it restores normal operation.
4. Is this PCB refurbished and tested?
Yes. This PCB is refurbished, cleaned, and fully tested to ensure reliable performance.
5. Who should install this PCB?
A Gas Safe registered engineer should install it to ensure safe and correct operation.






